Stage I Assembly This option includes
the complete assembly and installation of the front and rear suspension
components and installation of the steering rack.
Front suspension assembly includes the installation of upper and lower A-arms, ball joints,
spindle, coil-over shocks, brake calipers, flexible brake hoses, brake rotors, bearings,
steering rack and tie rod ends.
Rear suspension assembly includes the installation of the lower trailing arms,
third link arm, panhard bar, flexible brake hoses, coil-over shocks, brake calipers
and rotors.
(click to enlarge)
- Stage I Assembly:
$1,200
Stage II Assembly This option includes
the installation of the braking system, wiring, gauges, pedal assembly, steering
system and fuel system.
Braking system installation includes the installation of the brake &
clutch pedal assembly, brake & clutch master cylinders, all brake hard lines
and brake system bleeding.
Wiring system installation includes the master fuse box, front & rear lighting
circuits, battery cables & tray, ignition switch, turn signal switch, light switch,
fan switch, horn switch, horns and engine compartment circuit.
Gauge system installation includes the mounting of all gauges in the dash, gauge
lighting circuit, volt meter wiring and fuel gauge wiring. Other gauges can only be
connected after the running gear has been installed in your Hurricane 427 Roadster.
Pedal assembly installation includes the installation of the pedal box, hanging the
brake pedals, installing the gas pedal, mounting the master cylinders, and
installing the brake light switch.
Steering system installation includes the mounting of the steering shafts from the
steering wheel to the steering rack, all univeral joints, pillow block bearing, firewall
flange bearing and steering wheel.
Fuel system installation includes the mounting of the fuel tank, hard fuel line
from tank to engine compartment, flexible line from tank to hard line and fuel sending unit
in tank.